Step 24. Electrical.
Electrical subcontractor completes lights, switches, plugs, stove, range hood, hot water system and external lights. Then you go ahead and call for your final inspection.
After the completion of the painting, the electrician can complete all his work. He will fit power plugs, light switches, circuit breaker fuses, earth connection etc.
Notes: Make sure you have chosen ALL your fittings prior to this stage to avoid delay. Some items may take time to come in stock or be delivered.
The electrician will call the Electricity Commission for the mains connection and the connection of power. The electrician will also apply for a certificate on completion.
Your electrical finishing should match your initial lighting plan. You would have marked on your plans what you wanted in the design stage of your home.
FAQs

Yes. All standard plans can be modified to suit your needs. You can change the number of rooms, increase or decrease the size of the house or if you prefer, you can bring your own plans for costing. more »
A full inclusions list can be found here. In general however, the kit includes all materials required for lockup but does not include on-site labour, transport and delivery charges, site survey, site clearing, PC items, concrete for footings, Electrical and plumbing etc. more »
Delivery areas include all Australian states and territories. Arrangements can also be made for international deliveries excluding some countries. more »
As an owner builder/manager you are effectively cutting out the builder and therefore should make a saving of 20% to 30%. If you choose to be more hands on and undertake some of the manual tasks such as erecting the walls and roof trusses, installing windows, doors and painting the internal and externals etc, your savings will be increased further. more »
The process to obtain an owner builders permit is usually very straight forward. There are a few requirements and depending on which state you are building in, may also require you to undergo a short course (usually a weekend course), either online or at a training school. In most states a small application fee is payable. Click here for more owner builder information. more »
Yes. Cyclonic kits can be purchased at an additional cost. These kits are manufactured with extra reinforcements that will make then suitable for areas prone to cyclones. All standard kits can be upgraded to cyclonic kits. All standard kits can be manufactured to meet with the cyclonic rating required for your area. more »
This is determined by the size of the home. Generally we can have the kit on site within three to five weeks from time of ordering. more »
The entire kit can be delivered to your site in a shipping container, or part container and part by truck. Delivery can also be made in stages upon request. It is up to you what is more suited to your build plan. more »
This depends upon the amount of labour and skill level. As a guide, a non-skilled owner builder can erect frames and roof trusses for an average size home in two to three days then the remainder of the build is similar to that of normal build times. A smaller kit can be built to lock up within a month. Larger, more complex homes will take longer. You should allow ten to twelve weeks on site for an average home. more »
The steel frame is Backed by a 50 year BlueScope Steel warranty and all other components of the build have their individual manufacturers warranties. more »